Contract and FF&E

Hotel, restaurant, office and multi-unit residential programmes, specified and scheduled.

A contract showroom floor with seating laid out across it

What decides it

Holding one specification across hundreds of units, and still being able to supply a replacement piece in year three.

Holding one specification across hundreds of units, and still being able to supply a replacement piece in year three. Contract work fails on continuity rather than on the first delivery. A factory that produced a beautiful mock-up room may not have the documentation discipline to repeat it on floor eleven.

Why the piece is worth having

Brazilian hospitality has produced genuinely designed buildings, and the suppliers behind them are used to working to an architect's drawing rather than to a catalogue. For an FF&E programme that means a specification is a conversation rather than a substitution exercise.

Where Brazil does not win

Not on the largest programmes at the lowest opening price, where China and Vietnam have both the capacity and the practice. That gap is widest for a buyer in North America or Europe. For a hospitality programme in Latin America, proximity changes the calculation twice over: on the first delivery, and again in year three when a replacement piece is needed and the origin is a week away rather than a quarter.

Where it is made

Across the southern clusters, with specification and design coordination usually run from São Paulo.

Minimum order

Across our network, a first order usually starts somewhere between USD 10,000 and 20,000. That is a planning figure, not a quote: it moves with the manufacturer, the category, the complexity of the piece and the production run behind it. Some factories go lower for a first trial, others will not open an account below a container. That is the arithmetic of production from a factory. Where the work is authored or an edition, bought from a studio or a gallery rather than off a production line, the minimum is set by the piece rather than by the run, and the figures above do not apply.

A finished armchair standing against a wall of stacked lumber

What to ask on the first call

A vague answer to any of these is itself an answer.

  1. Can you hold this specification across the full programme, and what is your process when a component goes out of supply in month eight?
  2. What is your commitment on replacement pieces in year three, and at what minimum quantity?
  3. Show me a mock-up room, then show me the production records from the last programme of this size.
Close detail of a turned and jointed chair frame

Next step

Start with a diagnostic.